/before
/proposed
location: hosur, ka
status: completed (2013)
scope: architecture + allied services
plot area: 5 acre (phase I)
granite processing plant (multi-wire)
The primary design challenge here was to accommodate this Heavy Industry in an irregular linear plot with a comparatively small frontage. A large span RCC Structure is proposed in front of the PEB industrial structure to house the administrative office, cafeteria & suite room @ upper level allowing a free movement of heavy vehicles below carrying raw materials & finished goods.
location: hosur, ka
status: completed (2013)
scope: architecture + allied services
plot area: 5 acre (phase I)
granite processing plant (multi-wire)
The primary design challenge here was to accommodate this Heavy Industry in an irregular linear plot with a comparatively small frontage. A large span RCC Structure is proposed in front of the PEB industrial structure to house the administrative office, cafeteria & suite room @ upper level allowing a free movement of heavy vehicles below carrying raw materials & finished goods.
/before
/proposed